An independent technical brief on the infrastructure around Old Trafford: the stadium, the training campus and the systems that now help decide matches.
Club founded by railway workers as Newton Heath LYR, the works team of the Lancashire & Yorkshire Railway.
The club moves to Old Trafford, its home for more than a century.
Redeveloped Carrington training campus opens; plans for a new 100,000-capacity stadium are unveiled.
Upgrades at Old Trafford: roof drainage, pitch work and new self-service concessions. Most of the land for the new stadium secured.
Target window for moving into the new stadium, after an estimated four to five years of construction.
The current ground is in a holding pattern: it has to keep working well for several more seasons while its replacement is designed next door. For 2026 the focus is on long-overdue fixes rather than expansion.
The best-known issue is the roof. Drainage and blocked gutters are being addressed, and the playing surface is getting work on drainage and turf quality.
Designed by Foster + Partners, the proposed stadium would sit roughly 350 metres north-west of the current ground. The club officially calls the project Old Trafford Regeneration; the architects' fact sheet uses the name New Trafford.
The whole bowl sits under a single umbrella-like canopy that collects solar energy and rainwater.
Three tall masts hold the canopy up and are meant to make the building visible for tens of kilometres. Underneath, a public plaza is planned at about twice the size of Trafalgar Square. The stadium is the centrepiece of a wider Trafford Wharfside regeneration with new homes, transport links and walking and cycling routes.
The training complex received a £50 million rebuild of the men's first-team building, completed in August 2025 after a year in temporary facilities. Together with a £10 million building for the women's team and academy, total investment passed £60 million and brought every team onto one campus.
Equipment upgraded throughout, with dedicated spaces for conditioning, nutrition and recovery.
Among the less usual additions: a Formula 1 simulator and a padel court for the squad.
Much of the executive staff moved in from the stadium, making the training ground the club's day-to-day centre.
In use in the Premier League since April 2025. Around 30 cameras track players optically, the system places the virtual offside line automatically and generates the graphics fans see in the stadium and on TV. The video assistant referee still confirms the decision.
The system was developed together with the referees' body PGMOL and Genius Sports. It first appeared at elite level at the 2022 World Cup.
Camera-based goal-line systems tell the referee within a second whether the whole ball crossed the line. In domestic cup competitions they run at grounds of Premier League and Championship clubs, while semi-automated offside is limited to Premier League stadiums because of the infrastructure it needs.